exceptDate property
Defines a SchemaDate
or SchemaDateTime
during which a scheduled
SchemaEvent will not take place. The property allows exceptions to a
SchemaSchedule to be specified. If an exception is specified as a
SchemaDateTime
then only the event that would have started at that
specific date and time should be excluded from the schedule. If an
exception is specified as a SchemaDate
then any event that is scheduled
for that 24 hour period should be excluded from the schedule. This allows
a whole day to be excluded from the schedule without having to itemise
every scheduled event.
Implementation
String? exceptDate;